A friend of mine approached me about making some Wide running boards for his RMK 900. And i offered to help him get the word out there and see if it was something he would be able to make and sell some sets of them to my buddies on snowest..
Its all in the planning and design stages at this point, but i wanted to get the word out soon, so get an idea if anyone was interested in getting a set this summer for the sleds now that sledding has come to an end
Essentially, they would be similar to the SKINZ Airframe boards, but would incorporate the coolant down the running boards (like the VE tunnel boards).
If there is a market for WIDE boards from the console to the rear cooler AND a kit that TAPERS in like the stock running boards, that could be an option if there is a market for them.
144/151 tunnels would be different lengths then 159/166 boards as the rear cooler is set back, so it would take some time to get them setup for each model...
He has asked for a price of $350/set at most....but depending on market and setup, it may vary...but that is the best price for now.
if you are interested, please PM me, or reply to this post and if we can get say 5 guys interested, he can start getting some mock ups and update the build progress of them so you would be able to see them..
They will have built in traction down the outter edge, and screws on the cross bars like below...
Attached is the SKINZ boards...would be SIMILAR, but NOT exact...
I like these as well. I was considering buying a dragon wide borad insert and trying to make it work. I think I'm in for a set for my 600 with is the same tunnel..
is that a 144/151 tunnel? if so he doesn't have one to mock them up on. Anyone want to drop theirs off?
These ones are one the 159/166 tunnel and the cooling hoses are farther back.
Ahhh, must have missed that part....yea mines a 144/151 I didn't know that the coolant location was different on them.
Your in Detroit? I fly there on Monday. I work for a company based in Rochester hills.
Any progress?
We just talked on here like a week ago and I said I wasn't making those boards for the shorter 144-151 tunnel. So no, there hasn't been any progress. I might have one of those sleds available to build mock up from, but it wouldn't be for awhile, a long while probably.