47. Dress the hole edges with a file to remove any sharp edges.
Vacuum up and blow-away any chips and filings.
48. Cut 3 small pieces of Rubber Edge Trim to fit the bulkhead.
We recommend gluing them in place with a 3M Gasket & Weather Strip Adhesive Glue or similar.
See Figure 27C.
At this point I realized I had made a mistake.
I installed the rubber insulation on the LH side as well as the RH side.
Looks like that was NOT necessary, so I will probably be removing it from the RH.....
Cut and test fit the 3 strips
Glued and clamped just like before.
Vacuum up and blow-away any chips and filings.
48. Cut 3 small pieces of Rubber Edge Trim to fit the bulkhead.
We recommend gluing them in place with a 3M Gasket & Weather Strip Adhesive Glue or similar.
See Figure 27C.
At this point I realized I had made a mistake.
I installed the rubber insulation on the LH side as well as the RH side.
Looks like that was NOT necessary, so I will probably be removing it from the RH.....
Cut and test fit the 3 strips
Glued and clamped just like before.
Last edited: