Figured I need to get one more season out of this 04 before I up grade next season and since the motor is still really good with IndayDan warranty I figured I'll put a little money and time to fix up the chassis. After 5 seasons of severe beatings I stripped it down the the bulkhead and replaced all the bent and broken pieces, there were many. Both footwells were bent up, trailing arm bolts were bent and very hard to get out. PTO motor mount was busted, I could go on and on. Since I had it stripped down I picked up a used cheap set of wider running board inserts from VanAmburg and modified them to work with my better boards. Replaced all the bearing etc. New custom rails from Iceage, new drivers from Avid, mine were rounded down. New 162 x 2.5 Camo, powder coated some parts and put a side wrap on the tunnel. Modified my HPS can to fit better and welded a plate on the bottom to completely plug the exit hole in belly pan. Turned out pretty good IMO. Should be good to go for this winter.