9r's are a little quicker out of the gate. Boosts take a little bit to reel them in.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
9r's are a little quicker out of the gate. Boosts take a little bit to reel them in.
They kept building sleds during the stop ride. As they came off the assembly line and were crated up, they then got stacked in the back lot. So the sleds that got built first are now against the back fence, while the last ones built are the ones easily accessible to load onto trucks. We've been told the 9R were the last to be built and now they seem to be the first ones shipping. My boost had an original shipping date of mid Nov and now TBD stillI'm curious as to everyone's theories as to why the Boosts originally had delivery dates ranging from mid november to mid december and the 9r's from mid december to mid january, but now that the recall is working itself out, all the 9r orders are being shipped while the boosts are still "TBD" on the website? Is there another recall coming for the boosts?
Tomorrow dealers get the reflash.Anyone have info on the brake fix validation? We wont be picking up our sleds until the fix is validated
I get that all the time . Me and wisdom all in the same sentence.If it wasn't for your wisdom, we'd all be lost around here...
Fixed it.If it wasn't for your wifes wisdom, we'd all be lost around here...
That's not true. I tell her that even though she is an engineer, I'm way smarter than herFixed it.
Whats your location ?My dealer just got in 4 boost's and 2 9r's but none of the 9r's were mine. I have a 650 khaos 146 ordered to, can't believe that's not in yet!!!
Went to school for 4 years to become stupid ??That's not true. I tell her that even though she is an engineer, I'm way smarter than her
Went to school for 4 years to become stupid ??
Whats your location ?
Is this a theory? My friends and I ordered three 9Rs 155s from the same dealership. My tunnel is lime, and theirs is black. Mine is showing TBD, while theirs has a ship date.They kept building sleds during the stop ride. As they came off the assembly line and were crated up, they then got stacked in the back lot. So the sleds that got built first are now against the back fence, while the last ones built are the ones easily accessible to load onto trucks. We've been told the 9R were the last to be built and now they seem to be the first ones shipping. My boost had an original shipping date of mid Nov and now TBD still
It has been said the most common builds go first.Is this a theory? My friends and I ordered three 9Rs 155s from the same dealership. My tunnel is lime, and theirs is black. Mine is showing TBD, while theirs has a ship date.
My 9R is all black 155 2.75 with Ipad screen and it was shipped on December 16thMine isn't built yet but i didn't want one of those common yellow ones