T
Turbo11T
Well-known member
Yes. . . . Takes longer than you can imagine.
Jtab, Definately agree. . . . It is the small stuff that takes the longest. And these are the things that most guys underestimate. Some times the easiest things are take the longest and may have a guy scratching his head and also these are the final fit and finish things that set the build apart from others builds.
As for me I am far enough in. . . this chassis a triple. It had a triple 2 stroke sitting in it last summer and that project got halted from buying the vector, this chassis just wanted a triple, turns out it wanted a turbo triple 4 stroke.
I agree lots of things will come up steering, intercooler, oil tank etc motor fit is easy the rest is the hard part. But it all can be done, and it works this sled will be a blast to ride.
Jtab, Definately agree. . . . It is the small stuff that takes the longest. And these are the things that most guys underestimate. Some times the easiest things are take the longest and may have a guy scratching his head and also these are the final fit and finish things that set the build apart from others builds.
As for me I am far enough in. . . this chassis a triple. It had a triple 2 stroke sitting in it last summer and that project got halted from buying the vector, this chassis just wanted a triple, turns out it wanted a turbo triple 4 stroke.