I guess Im failing to understand why youre arguing. I was trying to point out multiple short tracks sleds were houred out before the demo rides were over.
The assembly line sleds were built over 90 days ago. Averaging 50 miles a day with dozens of riders and its your job to wear them out is not at all far fetched to me.
The assembly line sleds were built over 90 days ago. Averaging 50 miles a day with dozens of riders and its your job to wear them out is not at all far fetched to me.