Here's some pics of my summer project. It's almost done...mostly cosmetic. I tore the sled all the way down, cleaned up everything then re installed everything
1. 09 style seat post
2. New exhaust bellows
3. Cleaned exhaust valves
4. Cleaned reeds.
5. FBF throttle/oiler cable
6. Heli-Coil rear engine motor mounts...all new grade 8 motor mount bolts.
7. Adjust TPS
8. New fuel filter
9. Install wire loom and reflective tape on "everything" wire related
10. New pull cord
11. New 09 plastics kit
12. New CoBe front bumper
13. New shock tower vents
Powder Coated:
1. Primary clutch cover (Red)
2. Secondary face (Red)
3. Stator cover and torque stop (Red)
4. Main engine side braces (Blk)
5. Throttle body cover plate (Blk)
6. A-Arms & spindles (Blk)
Left to do:
1. Install new, balanced clutch
2. Install new helix - 62-44-46-E 62-42-46-E
3. Install new SLP Power Pro w/ new saddles
4. Re-install rebuilt, re-valved Fox Zero Pro rear track shock
5. Install new rear bumper (Skinz or CoBe still undecided)
6. Change chain case oil
7. Console vents above foot wells
8. Add'l dash vents
9. Install tether
10. Install LED tail light
Clicky Button: Summer Build 2010
1. 09 style seat post
2. New exhaust bellows
3. Cleaned exhaust valves
4. Cleaned reeds.
5. FBF throttle/oiler cable
6. Heli-Coil rear engine motor mounts...all new grade 8 motor mount bolts.
7. Adjust TPS
8. New fuel filter
9. Install wire loom and reflective tape on "everything" wire related
10. New pull cord
11. New 09 plastics kit
12. New CoBe front bumper
13. New shock tower vents
Powder Coated:
1. Primary clutch cover (Red)
2. Secondary face (Red)
3. Stator cover and torque stop (Red)
4. Main engine side braces (Blk)
5. Throttle body cover plate (Blk)
6. A-Arms & spindles (Blk)
Left to do:
1. Install new, balanced clutch
2. Install new helix - 62-44-46-E 62-42-46-E
3. Install new SLP Power Pro w/ new saddles
4. Re-install rebuilt, re-valved Fox Zero Pro rear track shock
5. Install new rear bumper (Skinz or CoBe still undecided)
6. Change chain case oil
7. Console vents above foot wells
8. Add'l dash vents
9. Install tether
10. Install LED tail light
Clicky Button: Summer Build 2010
Last edited: