S
Snowjunky
Well-known member
Here is my newest project. Got the trailer home and started to get the floor ready for epoxy coating. Left the heater on over night and the temps dropped to 21 degrees. Soaked and I mean soaked the floor with condensation. Scratch epoxy for a few days and started tearing it apart for insulation. Using 1 inch closed cell dual foil on the walls and 1 1/2 on the roof. I will use blue 2 inch under floor later. I am replacing my Wells Cargo 20 footer with this 28 footer. Lots of plans before next weekend. Pics will follow. Chime in with any comments or suggestions. Lots of good ideas in the other post that I will follow but ya never know what else someone has done!
Last edited: