So, my sled once had electric start and a battery but i removed them for some reason.
Now i want to install a battery again ang hook up a gps to it but i cant really figure out how to hook the battery up.
From the harness comes two red wires, one hooks to the starter solenoid and the other goes to the voltage regulator.
From the voltage regulator comes a black wire, presumably ground. SHould this go to NEG on the battery?
And a red wire that also goes to the startersolenoid to the thicker wire that connects the solenoid with the battery.
Any ideas?
Now i want to install a battery again ang hook up a gps to it but i cant really figure out how to hook the battery up.
From the harness comes two red wires, one hooks to the starter solenoid and the other goes to the voltage regulator.
From the voltage regulator comes a black wire, presumably ground. SHould this go to NEG on the battery?
And a red wire that also goes to the startersolenoid to the thicker wire that connects the solenoid with the battery.
Any ideas?