T
2015 Pro RMK 155 with only 500 miles and in excellent condition. Mostly trail miles since last year was a light snow year.
Sled was professionally built including:
SLP Stage 5 kit $2,730.00 with shipping...
(Kit gives 26 more hp but is closer to 30 with the clutch weights I have in it)
MDS adjustable clutch weights $250.00
Zbroz 36" A - Arms $480.00
Zbroz Exit X1 Clickers and Triple Rate Springs $1,150.00
Dan Adams Bars (Full kit with warmers) $159.00
VEI (Vanamburg) Custom Lightweight Rear Cooler (Cools trail temps by 40 degrees) $280.00
Sled Solutions Tunnel Bag $200.00
Shop Labor $2,950.00
Almost 19K invested
This sled is 18 pounds lighter than stock, even lighter than a 2016.
I only use the best Non-ethanol super premium fuel and Redline Racing Oil. Excellent maintenance. Always covered and stored inside a shop.
The clutching and everything else is 100% dialed in for WA riding. Clutch weights can be adjusted in 10 minutes for different elevations... This is a very impressive sled and a blast to ride. Super clean. Only selling because I bought another project for this year.
$8,500
Sled was professionally built including:
SLP Stage 5 kit $2,730.00 with shipping...
(Kit gives 26 more hp but is closer to 30 with the clutch weights I have in it)
MDS adjustable clutch weights $250.00
Zbroz 36" A - Arms $480.00
Zbroz Exit X1 Clickers and Triple Rate Springs $1,150.00
Dan Adams Bars (Full kit with warmers) $159.00
VEI (Vanamburg) Custom Lightweight Rear Cooler (Cools trail temps by 40 degrees) $280.00
Sled Solutions Tunnel Bag $200.00
Shop Labor $2,950.00
Almost 19K invested
This sled is 18 pounds lighter than stock, even lighter than a 2016.
I only use the best Non-ethanol super premium fuel and Redline Racing Oil. Excellent maintenance. Always covered and stored inside a shop.
The clutching and everything else is 100% dialed in for WA riding. Clutch weights can be adjusted in 10 minutes for different elevations... This is a very impressive sled and a blast to ride. Super clean. Only selling because I bought another project for this year.
$8,500
Last edited: